- Project Based Trainings
- MW Antenna Installation & Alignment
- Field Drive Test
- VSWR and Power Measurement- Site Master in subcon scope
- CW Test without tools (GSM/UMTS/CDMA/WiMax/EvDO/LTE)
- Cable laying & installation
- INST. OF 48V 75 AH – 50 KGS BATTERY
- INST. OF POWER SYSTEM,48V,0.8-2 KW
- CONNECTORIZATION OF CABLE
- CHRG:SITE SURVEY WTH VALIDATION OF TSSR
- INST. OF SMALL CELLS ON POLE/WALL ETC
- BB Installation 4000 AH
- Benchmarking
- BTS Feeder Cable and Antenna Installation for RTT Site (per SOW-Atteched)
- BTS Integration
- Cluster Optimization
- Commissioning & Integration (1.8)
- conversion of Indoor BTS to Outdoor BTS for Allahabad Cluster swapping BTS Sites
- CW Test and Model Tuning
- De- Installation of indoor BTS
- De-installation of Microwave Hop
- EMF Broadband Testing
- EMF Calculation
- EMF Survey
- LOS Survey (Only Without Link Budgeting)
- LTE/4G EMF survey (With Tool)
- Microwave (1+0) Installation, Commissioning & ATP with Antenna Size=0.6m
- Optimization of the site including documenta
- RF Optimization
- SCFT
- Site survey
- Technical Site Survey for Radio (RF Survey)