Project Based Trainings

  • Project Based Trainings
  • MW Antenna Installation & Alignment
  • Field Drive Test
  • VSWR and Power Measurement- Site Master in subcon scope
  • CW Test without tools (GSM/UMTS/CDMA/WiMax/EvDO/LTE)
  • Cable laying & installation
  • INST. OF 48V 75 AH – 50 KGS BATTERY
  • INST. OF POWER SYSTEM,48V,0.8-2 KW
  • CONNECTORIZATION OF CABLE
  • CHRG:SITE SURVEY WTH VALIDATION OF TSSR
  • INST. OF SMALL CELLS ON POLE/WALL ETC
  • BB Installation 4000 AH
  • Benchmarking
  • BTS Feeder Cable and Antenna Installation for RTT Site (per SOW-Atteched)
  • BTS Integration
  • Cluster Optimization
  • Commissioning & Integration (1.8)
  • conversion of Indoor BTS to Outdoor BTS for Allahabad Cluster swapping BTS Sites
  • CW Test and Model Tuning
  • De- Installation of indoor BTS
  • De-installation of Microwave Hop
  • EMF Broadband Testing
  • EMF Calculation
  • EMF Survey
  • LOS Survey (Only Without Link Budgeting)
  • LTE/4G EMF survey (With Tool)
  • Microwave (1+0) Installation, Commissioning & ATP with Antenna Size=0.6m
  • Optimization of the site including documenta
  • RF Optimization
  • SCFT
  • Site survey
  • Technical Site Survey for Radio (RF Survey)
JOIN US
Join with us before fill this fields !
Thank You. We will contact you as soon as possible.